Operations
Stock & Inventory Control
Warehouse and van stock in one place, with reorder points that fire before an engineer runs dry.
1 reorder alerts
Stock on hand
£10,040
-3.1%Across 7 SKUs
Below minimum
1
+1%Auto reorder queued
Van stock value
£18,400
+4.2%6 vehicles
Stock turn
6.8x
+0.9%Annualised
Stock levels vs minimum
Warehouse plus van, red where reorder is due
Van stock fill
Percentage of standard load list
MB24 KTXMarcus Hale
86%
LR73 PVNJodie Fenn
62%
GK71 WSORavi Patel
41%
YT22 HRETomasz Wójcik
74%
CD70 ZLAAmara Boateng
93%
NP23 QFBEllie Marsh
28%
AI insight
NP23 QFB is at 28% and has three jobs booked tomorrow needing MCBs. A replenishment pick has been raised at the warehouse for 06:30 collection.
Inventory
Live levels, cost and supplier lead time
| SKU | Item | Warehouse | On vans | Minimum | Lead time | Status |
|---|---|---|---|---|---|---|
| PMP-256 | Circulating pump 25/6 | 14 | 6 | 10 | 3 days | In stock |
| VLV-22I | Isolation valve 22mm | 96 | 42 | 60 | 1 days | In stock |
| EXV-12L | Expansion vessel 12L | 4 | 2 | 8 | 7 days | Reorder now |
| FLT-G4 | AHU filter G4 panel | 38 | 12 | 30 | 2 days | In stock |
| CBL-6MM | SWA cable 3-core 6mm (m) | 420 | 80 | 250 | 4 days | In stock |
| BRK-32A | MCB 32A type C | 7 | 18 | 25 | 2 days | Running low |
| SNS-TMP | Duct temperature sensor | 22 | 5 | 12 | 5 days | In stock |