Operations
Digital Twin & Interactive Site Plan
A live model of the building. Click any zone to drill into assets, sensor telemetry, open jobs and service history.
Meridian — Sheffield WorksSensors live
Zones monitored
7
1 of 6 sites
Connected assets
104
+6%IoT + manual
Zones on watch
2
+1%Trending out of tolerance
Active faults
1
+1%Engineer dispatched
Site plan — Sheffield Works
Colour shows live zone health, pulse marks an active fault
HealthyTrending out of toleranceActive fault
Plant Room
Zone Z1 · last serviced 14 Jun 2026
Fault34.8°C
- Assets
- 12
- Open jobs
- 2
- Engineer
- Ravi Patel
- Last service
- 14 Jun 2026
Compressor CB-07 vibration above threshold.
Live asset telemetry
Predicted failure risk from sensor trend
- 78%
CB-07 Compressor
Plant Room · Vibration 7.9 mm/s
- 18%
AHU-02
Offices · Filter load 62%
- 54%
CS-Chiller-1
Cold Store · Suction temp -16.8°C
- 61%
Dock Leveller 3
Loading Bay · Cycle pressure 138 bar
- 9%
TX-Main
Substation · Load 71%
Predictive maintenance
Compressor CB-07 in the Plant Room shows a 78% likelihood of failure within 14 days based on vibration and run-hours trend. The system has already drafted a planned inspection for Ravi Patel on Tuesday — preventing an estimated £18,400 of unplanned downtime.