Digital Twin & Interactive Site Plan

A live model of the building. Click any zone to drill into assets, sensor telemetry, open jobs and service history.

Meridian — Sheffield WorksSensors live

Zones monitored

7

1 of 6 sites

Connected assets

104

+6%IoT + manual

Zones on watch

2

+1%Trending out of tolerance

Active faults

1

+1%Engineer dispatched

Site plan — Sheffield Works

Colour shows live zone health, pulse marks an active fault

Plant Room12 assets · 34.8°C2 open jobsProduction Hall A34 assets · 21.4°CCold Store6 assets · -18.2°C1 open jobWarehouse21 assets · 18.9°COffices18 assets · 22.1°CLoading Bay9 assets · 24.6°C1 open jobSubstation4 assets · 27.3°C
HealthyTrending out of toleranceActive fault

Plant Room

Zone Z1 · last serviced 14 Jun 2026

Fault34.8°C
Assets
12
Open jobs
2
Engineer
Ravi Patel
Last service
14 Jun 2026

Compressor CB-07 vibration above threshold.

Live asset telemetry

Predicted failure risk from sensor trend

  • CB-07 Compressor

    Plant Room · Vibration 7.9 mm/s

    78%
  • AHU-02

    Offices · Filter load 62%

    18%
  • CS-Chiller-1

    Cold Store · Suction temp -16.8°C

    54%
  • Dock Leveller 3

    Loading Bay · Cycle pressure 138 bar

    61%
  • TX-Main

    Substation · Load 71%

    9%

Predictive maintenance

Compressor CB-07 in the Plant Room shows a 78% likelihood of failure within 14 days based on vibration and run-hours trend. The system has already drafted a planned inspection for Ravi Patel on Tuesday — preventing an estimated £18,400 of unplanned downtime.